Technical expert assignment for the major overhaul of Units 3 and 4 at the Calaca coal-fired thermal power plant. The engagement covered supervision of the full overhaul of two 135 MW steam turbines, including in-depth diagnostic and root cause analysis of serious mechanical failures (blade fractures, severe vibrations, rotor rubbing). The team identified the root […]